GREGOR solar telescope: Design and status
The integration and verification phase of the GREGOR telescope reached an important milestone with the installation of the interim 1 m SolarLite primary mirror. This was the first time that the entire light path had seen sunlight. Since then extensive testing of the telescope and its subsystems has been carried out. The integration and verification
Volkmer, R. et al.
Fecha de publicación:
6
2010