General shots of the interior of the GTC (July 2005)
Media
- On-site evolution of the Civil Works and the GTC Dome
- Movement tests on the GTC elevation axis
- Arrival of the GTC tertiary mirror
- First parking of the GTC tertiary mirror
- Simulating with dummies the weight of the mirrors and instruments in the GTC
- Placing the GTC primary mirror cell
- Animation of the orbits of the six planets around HD110067
- Installation and test of the GTC verification camera
- GTC acquisition and guidance camera test
- Installing the GTC M2 spider
- Installing the GTC elevation ring
- Leonids in 1999
- The Shesat instrument for the alignment of temples in Ancient Egypt
- The Shesat sign as a topographical instrument
- Astronomical orientation of the pyramids
- Light path in Themis telescope
- Correction of field rotation in an altazimuthal telescope
- Solar wind
- Sunspot scale